Bamati Patchwork Wall - mat requirements
issueid=2360 02-01-2016 01:58 AM
Casondrah
Bamati Patchwork Wall - mat requirements

Wasn't sure whether to post this here, it's not a bug per se, but....possibly something to look into.

Was reminded today why I don't use the Bamati Patchwork walls. Got lots of ideas to use it on....then I see the mat requirements so I make something else work.

To build one 2m wall, I would need a total of 11 long logs. Plus twine and nails, but it's the number of logs needed that makes me turn around and cancel it out. The 4m ...needs roughly 22 logs per wall! 16 long wood posts (16 logs) and 8 medium wood sheets (another 6 logs).

When comparing it to the other walls the required mats just seem high and out of place. The Pioneer 2m wall needs only 2 long logs and some nails, the Banaya log wall takes 4 I believe, even the Bamati lalag wall (which is nearly identical in looks except for the bracing poles) only requires 2 long logs and 2-3 short logs. The Bamati Ply roof 4x4 only requires 9-10 logs total. Those numbers all seem right, but the patchwork wall, not so much.

I like the look of the patchwork wall and would use it much more if I didn't have to clear a zone of trees just to build a structure using that BP. ;) Just thought it maybe warranted a look. If it's as its supposed to be, please close this out, but if not, hopefully some adjustments could be made.
This issue is closed. No more replies may be made.
Issue Details
Issue Number 2360
Project Bugs Reports
Category Unknown
Status Fixed / Resolved
Priority Unknown
Affected Version Unknown
Fixed Version (none)
Users able to reproduce bug 0
Users unable to reproduce bug 0
Assigned Users (none)
Tags (none)




02-05-2016 10:54 AM
Yes, these were incorrect. They should have been Long Wood Poles not Long Wood Posts.


I've corrected the blueprint and reduced the number of Sheets required as well and patched the new data last night.


Thanks!
 

02-07-2016 01:22 AM
Visitor
Thanks much!! Can't wait to start using them. :)